Pricing
Simple pricing, every rupee explained. Start with a free Bill X-ray, and pay for a pilot only when the X-ray shows something worth measuring. All prices are plus GST.
| Step | What you get | Price |
|---|---|---|
| Bill X-ray | Send your last 3 electricity bills on WhatsApp. Within 2 working days you get a one-page written reading: your demand against the contract-demand floor, the power-factor or kVAh effect, your Time-of-Day exposure, and rupees per line, with tariff page references. | Free |
| 30-day pilot | Measurement on your main incomer and up to 3 feeders, a daily written review, and a final report reconciled to your next bill. | ₹15,000, credited in full to your plan if you continue within 30 days |
| Single (1 measurement point) | Six months of tariff accounting, measurement included: installation, daily review, written reports and a monthly reconciliation of your bill against our readings. | ₹30,000 upfront, then ₹3,000/month from month 7 (or ₹30,000/year paid upfront) |
| Plant (2–10 points) | The same, across your feeders, so each line of the bill can be traced to the circuit behind it. | ₹30,000 + ₹20,000 per extra point, then ₹3,000/month + ₹1,000 per extra point |
| Watch | A monthly bill check and alerts, for after the first six months. | ₹1,000/month |
| Large HT plants and groups | Plants with a large contract demand, or several sites. | Priced by contract demand, or on a share of verified savings. Talk to us. |
| New plant or expansion | A contract-demand sizing note before you fix your contract with the utility. | Talk to us |
Send 3 bills on WhatsApp for a free Bill X-ray →
The small print
- All prices are plus GST. Payment comes first, then we activate the service; larger orders need an advance.
- The equipment is yours, with a 12-month warranty against manufacturing defects.
- Fees are not refundable. The pilot fee is credited to your plan, not refunded.
- We recommend; we never control your machines.
Questions
Why isn’t the pilot free?
A paid pilot means both sides take the result seriously. The full fee counts towards your plan if you continue within 30 days.
Will you cut wires or stop production?
The sensors clamp around existing cables; nothing is cut. The voltage connection goes to a panel breaker, and the site survey tells you beforehand whether that needs a short planned isolation.
Do you replace my utility meter or power-quality meter?
No. We sit beside them. Your utility still bills on its own meter.
Which states do you cover?
Maharashtra (MSEDCL) and Karnataka today, each priced against its own tariff order.
How much will I save?
We don’t promise a number. We find it in rupees from your own bills, then check it against the next one.
Want to bring us plants instead? See the partner program.