← Nexura EnerTech
Case studies
How circuit-level readings become rupees. Each case study says first what kind of evidence it is, simulated or measured, calibrated or early, and cites every tariff figure to the order it comes from. We are new, so there are no customer results here yet; when there are, they will be labelled as such and approved by the customer.
- One plant, two tariffs: what changes when you can see inside the panelSimulated plant. A simulated auto-component plant priced under the Maharashtra and Karnataka 2026-27 industrial tariffs, with and without Nexura. ₹1,32,540 lower over two months in Maharashtra, ₹27,301 in Karnataka.
- What one electric-scooter charge looks like, read every two secondsField log · calibration run. Full power at a power factor near 1.00, a taper, then an hour idling at 0.25. Detail a 30-minute meter block and a monthly bill cannot carry.